Concrete coatings installation process

< back to Concrete Coatings

Expert Preparation & Application

 

 

 

 

 

 

 

 

Step 1: Preparation & Reconstruction

Preparation includes shot blasting and/or diamond grinding. Vacuum systems minimize dust.

Menders and fillers are then used to fix pits and cracks before the process begins.

 

 

 

 

 

 

 

 

 

Step 2: Base Coat & Broadcasting

Peak’s 100% solids, self-priming pure polyurea base coat is mixed and applied.

Immediately after the base coat is applied, the chip is generously broadcast by hand, providing both color and texture to the floor.

 

 

 

 

 

 

 

 

Step 3: Scraping Chip & Top Coat

Once the base coat is fully cured the floor is scraped and vacuumed to remove any loose or vertical standing flakes.

The final step is to roll out the UV stable polyaspartic clear coat.

 

 

 

Our Guarantee:
  • 4X stronger than epoxy
  • Will not chip or peel
  • 1-day installation
  • Easy to keep clean
  • 15-year residential warranty
  • 100% antibacterial
  • 100% antimicrobial
  • Easy on the feet