Before and After – Foundation Repair – SmartJacks – Lakewood

< Back to Foundation Repair Before & After

< Back to Before & After

Slide the yellow slider to see the Before and After images.

In this Lakewood crawlspace, the jacks supporting the main support beam had begun to rust and lose their structural integrity (note the leaning of the jacks before replaced). Peak Structural replaced the jacks with new concrete bases and Supportworks Smartjacks, which are made of galvanized steel and has an allowable system capacity of 30,000 pounds.